Hugh Munro Construction Ltd.

Projects

Current Projects

Below are current projects Hugh Munro Construction Ltd. has undertaken.

Year Project Owner $Million Description
2008/2009 MIT 5819 Manitoba Infrastructure
and Transportation (MIT)
10.8 Grade, Base and Pave PTH 57 to North OF PTH 49
2008 MFA C7A Manitoba Floodway
Authority (MFA)
5.6 Main Channel Excavation (West Bank) Red River Floodway Expansion PTH 59 North Bridge — Dunning Road
2008 MIT 5859 MIT 1 Drainage Improvements - Vicinity of Stead
2007 MFA C3C MFA 3.6 1.4 Kilometers of floodway channel expansion involving 475,000 cubic meters of excavation demolition of existing centerline drain outlet control structure and construction of new outlet control structure and realignment of the centerline drain channel
2007/2008 MFA CE1 MFA/PCL   Construction of expanded Outlet Control Structure for the Red River Floodway Expansion including Channel Excavation, Solid rock Excavation, coffer dams, Diversion works and Rip Rap
2007/2008 MIT 5712 MIT 12.9 Grade, Base and Pave PTH 10 for 13.1 KM from the south junction of PTH 2 North to PR 453

Go to top of page.

Completed Projects

Below are a number of projects completed by Hugh Munro Construction Ltd.

Year Project Owner $Million Description
2008 MFA W 15 MFA 2 Supply and place 65,000 tonne of Riprap
2008 West Hawk Lagoon Manitoba Water
Services Board
1.4 Expansion of existing sewage lagoon
2007 Floodway T 12 MFA 5.2 Construction of approximately 3km of rail embankment on CPR Emerson main line. Including 130,000 meters of prefabricated vertical drain installation and 209,000 tonnes of sub ballast
2006/2007 Floodway C-3A MFA 17 6 kilometers of floodway channel expansion including 2.4 million cubic meters of excavation
2006 Floodway A-1 MFA/Mulder   Channel excavation for the relocation of the Branch 1 and 2 Greater Winnipeg Water District Aqueduct
2006 Deacon WTP City of Wpg 2.4 Excavation and backfill for Winnipeg water treatment plant
2006 Deacons Dewatering Cells City of Wpg 6.9 Construction of 4 dewatering cells for the City of Winnipeg water treatment plant including 450,000 cubic meters of excavation, intercell piping, force mains, sludge pipe, subdrains, decant structures, metering chambers, pump station, Rip Rap and associ
2006 Floodway T-9 MFA/PCL   Excavation, Backfill & Rail Embankment Construction for bridge over Red River Floodway
2006 Floodway T-8 MFA/MDSteele   Access road construction and excavation for detour bridge construction
2006 Floodway T-5 MFA/MDSteele   Embankment construction, vertical drain installation, culvert installation, base and channel excavation for bridge construction PTH No. 1 at Red River Floodway
2006 Floodway T-4 MFA/PCL   Grade, base, pave and channel excavation for bridge construction PTH 59 South at Red River Floodway
2006 Easterville INAC/CCN 1 Rockwork
2005/2006 Fibre Optic Ashern-Dauphin Manitoba Hydro 3 Underground cable installation
2005/2006 Marcel Colomb 1st Nation INAC/Marcel Col. 3 Sewage Lagoon and Road Construction
2005/2006 Deacon WTP Clearwell CoW/Bird Const. 1 Earthworks
2005/2006 Deacon WTP Excavations City of Wpg 1 Earthworks
2005/2006 Dakota Plains Roads
and Drainage
INAC/Dakota Pl. 3 Install drainage system
2004 Kenora Walmart Ministic Prop./MapleLeaf 2 Site works
2004 Brochet Lagoon INAC/Arnason 3 Sewage Lagoon and Road Construction
2003 Fibre Optic Wpg to
Williams Lake
Manitoba Hydro 10 Underground cable installation
2002 Jones Road Reconstruct. City of Kenora, ON 2.5 Earth, Base, Asphalt Construction
2002 Bank Stabilization,
Kingston Row
City of Wpg 2 Limestone filled caissons and riprap
2002 Easterville Rockwork (Chemawawin Old Post Causeway) Chemawawin First Nation 1 Construct Causeway
2001 Waterfront Development City of Selkirk 1 Wardrop Engineering
2001 Site work, Kenora ON Trus Joist 10 Earthworks, Base Course, Sewer and Water for the new Weyerhaeuser Plant