top of page

HUGH MUNRO

Project Portfolio

25100.jpg

POINTS NORTH LANDING AIRPORT
 

This project’s scope of work consisted of milling the existing runway, reworking the material, smoothing and chip sealing the surface.

WINNIPEG FLOODWAY C3A

This project’s scope of work consisted of the Main Floodway Channel excavation, perimeter ditching, temporary erosion control measures, and revegetation.

floodway.png

CENTREPORT CANADA WAY

(CCW)

The project involved the design and build of grade separations for the CCW transporation corridor in the Northwest quadrant in the City of Winnipeg, RM of Rosser and RM of Headingley.

CCW.gif

EAST SIDE ROAD AUTHORITY

PR304

This project’s work consisted generally of the construction of a new all-season road from PR304 (KM55.2) for a total of approximately 11.8 kilometers to KM67.0, Berens River.

east side road.png

LAKE ST. MARTIN REACH 3

This project’s scope of work consisted of milling the existing runway, reworking the material, smoothing and chip sealing the surface.

lake.png
bottom of page