top of page

HUGH MUNRO

Project Portfolio

POINTS NORTH LANDING AIRPORT
 

This project’s scope of work consisted of milling the existing runway, reworking the material, smoothing and chip sealing the surface.

WINNIPEG FLOODWAY C3A

​

This project’s scope of work consisted of the Main Floodway Channel excavation, perimeter ditching, temporary erosion control measures, and revegetation.

Floodway

CENTREPORT CANADA WAY

(CCW)

​

The project involved the design and build of grade separations for the CCW transporation corridor in the Northwest quadrant in the City of Winnipeg, RM of Rosser and RM of Headingley.

CCW

EAST SIDE ROAD AUTHORITY

PR304

​

This project’s work consisted generally of the construction of a new all-season road from PR304 (KM55.2) for a total of approximately 11.8 kilometers to KM67.0, Berens River.

East Side road Project

LAKE ST. MARTIN REACH 3

​

This project’s scope of work consisted of milling the existing runway, reworking the material, smoothing and chip sealing the surface.

LAKE ST. MARTIN REACH
bottom of page