HUGH MUNRO
Project Portfolio
POINTS NORTH LANDING AIRPORT
This project’s scope of work consisted of milling the existing runway, reworking the material, smoothing and chip sealing the surface.
WINNIPEG FLOODWAY C3A
​
This project’s scope of work consisted of the Main Floodway Channel excavation, perimeter ditching, temporary erosion control measures, and revegetation.
CENTREPORT CANADA WAY
(CCW)
​
The project involved the design and build of grade separations for the CCW transporation corridor in the Northwest quadrant in the City of Winnipeg, RM of Rosser and RM of Headingley.
EAST SIDE ROAD AUTHORITY
PR304
​
This project’s work consisted generally of the construction of a new all-season road from PR304 (KM55.2) for a total of approximately 11.8 kilometers to KM67.0, Berens River.
LAKE ST. MARTIN REACH 3
​
This project’s scope of work consisted of milling the existing runway, reworking the material, smoothing and chip sealing the surface.